Zr-2 Niobium Alloy Bar
video
Zr-2 Niobium Alloy Bar

Zr-2 Niobium Alloy Bar

The corrosion resistance of Zr-2.5 Nb alloys is highly dependent on heat treatment. The quench-age corrosion rate of Zr-2.5 Nb alloys is higher than that of Zr-2 alloys.

Description

The Zr-2 alloy was first used on the first U.S. nuclear submarine in 1955, and after more than 20 years of practice, it has proven to be a reliable reactor as a fuel element cladding material and pressure tube material for both boiling water and pressurized water reactors. .
In order to improve the PCI resistance of Zr-2 alloy, the United States has developed Zr-2 tube lining technology with a pure zirconium layer thickness of 80-100μm.
Zr-2 alloy is generally used in the manufacture of boiling water reactors.

Products Description

The corrosion resistance of Zr-2.5 Nb alloys is highly dependent on heat treatment. The quench-age corrosion rate of Zr-2.5 Nb alloys is higher than that of Zr-2 alloys. It is higher than that of CO2 and air. Zr-2.5Nb does not differ much from Zr-2 after long-term corrosion (i.e., 30 years) in aqueous media (i.e., corrosion between 316-400°C). The corrosion resistance of Zr-2.5Nb (including the cold-worked condition with increasing corrosion temperature) is superior to that of Zr-2.

 

Professional Metal Suppliers - GNEE

Zr-4 Niobium Alloy Bar

Quenching-Cold Processing-Aging Zr-2.5Nb Alloys Corrosion Property
Quenching Temperature/˚C Cold Process Rate/% 500 Aging/h Corrosion Rate After Transition/mg·dm-2·d-1
316˚C Water 360˚C Water 400˚C Steam
880 0 6 0.50 1.38 1.44
880 10 6 0.12 0.40 0.72
880 20 6 0.05 0.20 0.26
880 30 6 0.03 0.10 0.29
880 0 24 0.05 0.43 3.3

 

Large-scale factory production

Zr-4 Niobium Alloy Bar

Zr-4 Niobium Alloy Bar

FAQ

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or if the goods are not in stock, it is 15-20 days, depending on the quantity.

Q: Do you provide samples? Is it free or extra?
A: Yes, we can provide samples for free without paying the shipping cost.

Q: What are your payment terms?
A: Payment <=1000USD, 50% in advance. Payment >=1000USD, 30% T/T in advance, balance before shipment. or negotiable

Q: About the product price of Zr-2 Niobium Alloy?
A: Due to cyclical changes in raw material prices, prices vary in different periods.

Hot Tags: zr-2 niobium alloy bar, China zr-2 niobium alloy bar manufacturers, suppliers, factory, Niobium Alloy, Titanium Seamless Pipe, ASTM B392 Niobium Alloy Bar, Gr9 Titanium Rod, CP Titanium Foil, 6Al 4V titanium foil Strip

(0/10)

clearall